concrete finishing USC school of Cinematic Arts

concrete has been poured on the 2nd floor of the west building. the concrete finishers hammer on the slab. operator performs a gymnastic maneuver but fails to hold it long enough to score with the judges.
Video Rating: 4 / 5

Tags: , , , ,

This entry was posted on Monday, February 20th, 2012 at 6:12 am and is filed under Trojan Scholars. You can follow any responses to this entry through the RSS 2.0 feed. You can leave a response, or trackback from your own site.

9 Responses to “concrete finishing USC school of Cinematic Arts”

  1. GIULIOPAVIMENTISTA Says:

    hi guys come on my channel and look et my movie

  2. 45322viking Says:

    ive done concrete work for 25 years this aint for mexicans its for real men

  3. burras2007 Says:

    concret is for MEXICANS ONLY FUCK THAT!!!

  4. maltee1960 Says:

    safety rails ?????

  5. haus05 Says:

    fuck i want one of those lol

  6. ghsstar Says:

    the rider just has “pans” on it they are just going over it for the first time. the guys on kneed boards are going around pipes,posts, etc

  7. SnOwBoArDeRgUs Says:

    My dad does concrete and i work for him and yea the guy with the tools wipes out the spots where the powertroll cant go so ya

  8. cinemachris Says:

    I’m not a concrete finisher, I just walk around with a camera and tell jokes. But I think the guys “on foot” finish the detail spots where the rider can’t get to

  9. The561Hero Says:

    fun ride? What is the point of the guy with the tools when you have the machine?

Leave a Reply